London Portsmouth
Overview
Level | Tier 3 |
Certification | ISAE 3402 Type II & CSAE 3416 |
Connected via | Peer 1 FastFiber Network™ |
Address | Building 5000, Langstone Technology Park, Langstone Road, Havant, PO9 1SA, UK |
Security | Security card and biometric access and NVR camera systems |
Backup and power | UPS and diesel generator power systems N+1 Backup Power Systems |
Technical Specifications
Power | Main 11kV feeder capacity – 10MW |
Secondary 11kV feeder provisions in place for future development | |
Medium and high density power designed for 5-15+ kW per rack |
UPS | Current capacity, 3 x 500kVA UPSs (N+1) |
Future capacity, 20 x 500kVA UPSs (N+1) |
Controlled Environment | Current capacity, 1,297kW (N+1) |
Future capacity, 9,313kW (N+1) | |
Excool air economizers as primary cooling (N+1) | |
Secondary chilled water based cooling system on site | |
“Free Cooling” heat exchangers in place | |
Temperature and humidity in the datacentre space maintained to 2011 ASHRAE Thermal Guidelines – temperature is maintained at 64 to 77ºF with 40-60% humidity |
Fire Detection & Suppression | Monitored analogue addressable fire detection system in all areas |
Photoelectric, ionization and heat detection sensors | |
Dry-pipe pre-action fire suppression | |
Clean agent fire extinguishers deployed throughout the facility | |
Active aspirating smoke detection system |
Network | Complete Juniper solution with carrier-grade MX routers at the distribution – high packet processing capability, huge ACL and rate limiting, QOS/COS capability, IPv6 and MPLS, scaleable |
Fully redundant switching architecture for true Non Stop Routing (NSR) and In Service Software Upgrade (ISSU) | |
Uses Virtual Router Redundancy Protocol (VRRP) for interoperability with other routing vendors | |
Juniper EX series switches with Virtual Chassis design – simplifi ed network design, scalability, reliance and redundancy, robust power supply, massive capacity, auto reconfi guration, on board automation, facility to tier up without recabling |
Building Management | Enterprise Building Management System in place, monitoring all aspects of infrastructure |
24/7 on-site staffing | |
Smart hands available on site and remotely for technical assistance and maintenance |
Security | External and internal HD CCTV cameras tied back to NVR systems |
NVR system tied to backup SAN storage | |
Video records retained for 90 days | |
Proximity access control system in place utilizing access card and biometric authentication | |
Mantrap in place utilizing ultrasonic technology for single person verification | |
Intruder and door tampering alarms in place | |
Secure managed loading dock |
Green Strategy | Excool air economizers in place providing a full capacity PUE of 1.1* |