Level Tier 3
Certification ISAE 3402 Type II
Connected via Peer 1 FastFiber Network™
Address Building 5000, Langstone Technology Park, Langstone Road, Havant, PO9 1SA, UK
Security Security card and biometric access and NVR camera systems
Backup and power UPS and diesel generator power systems N+1 Backup Power Systems

Technical Specifications

Power Main 11kV feeder capacity – 10MW
Secondary 11kV feeder provisions in place for future development
Medium and high density power designed for 5-15+ kW per rack
UPS Current capacity, 3 x 500kVA UPSs (N+1)
Future capacity, 20 x 500kVA UPSs (N+1)
Controlled Environment Current capacity, 1,297kW (N+1)
Future capacity, 9,313kW (N+1)
Excool air economizers as primary cooling (N+1)
Secondary chilled water based cooling system on site
“Free Cooling” heat exchangers in place
Temperature and humidity in the datacentre space maintained to 2011 ASHRAE Thermal Guidelines – temperature is maintained at 64 to 77ºF with 40-60% humidity
Fire Detection & Suppression Monitored analogue addressable fire detection system in all areas
Photoelectric, ionization and heat detection sensors
Dry-pipe pre-action fire suppression
Clean agent fire extinguishers deployed throughout the facility
Active aspirating smoke detection system
Network Complete Juniper solution with carrier-grade MX routers at the distribution – high packet processing capability, huge ACL and rate limiting, QOS/COS capability, IPv6 and MPLS, scaleable
Fully redundant switching architecture for true Non Stop Routing (NSR) and In Service Software Upgrade (ISSU)
Uses Virtual Router Redundancy Protocol (VRRP) for interoperability with other routing vendors
Juniper EX series switches with Virtual Chassis design – simplifi ed network design, scalability, reliance and redundancy, robust power supply, massive capacity, auto reconfi guration, on board automation, facility to tier up without recabling
Building Management Enterprise Building Management System in place, monitoring all aspects of infrastructure
24/7 on-site staffing
Smart hands available on site and remotely for technical assistance and maintenance
Security External and internal HD CCTV cameras tied back to NVR systems
NVR system tied to backup SAN storage
Video records retained for 90 days
Proximity access control system in place utilizing access card and biometric authentication
Mantrap in place utilizing ultrasonic technology for single person verification
Intruder and door tampering alarms in place
Secure managed loading dock
Green Strategy Excool air economizers in place providing a full capacity PUE of 1.1*