London Maidenhead

The lon-b zone was moved from this data centre to our fully owned London West data centre.

Overview

Level Tier 2
Certification ISO 9001 & ISO 27001
Connected via Pulsant – C4L’s Multihomed IP Transit
Address Priors Way, Maidenhead, Berkshire, SL6 2HP, UK
Security Security guards, building patrols, perimeter fencing, CCTV surveillance, secure locked cabinets and only permit access to authorised contacts with photo ID
Backup and power UPS and generators Backup Power Systems

Technical Specifications

Power The site is supported by multiple diversely supplied 2 MW on site substation. This is distributed to n+1 PowerWave UPS systems for critical load. The UPS’s are protected by multiple AKSA generators with 30 hours of fuel storage at full load onsite. There is a guaranteed contract to provide fuel every 24 hours by a local contractor to maintain 30 hours of fuel capacity.
Each rack can be dual fed, up to 16 Amps capacity.
Controlled Environment Cooling is provided by Airedale CRAC Water refrigerant cooling solution in each Data Centre hall configured to the N+1 standard per Data Centre hall.